
Ridgeline Western Construction
Framing • Additions • New Construction • Remodeling • Residential • Commercial
Attached ADU General Contractor
Attached ADUs are secondary dwellings tied into an existing house, often sharing walls, rooflines, utilities, and foundation conditions. Ridgeline Western Construction builds attached ADU scopes around structure first: wall openings, load paths, fire separation, access, permits, inspections, and licensed sub-trades managed under one contract.
What We Build In Attached ADUs
For attached ADUs, Ridgeline Western Construction handles the structural carpentry directly — this means opening and reinforcing load-bearing walls, tying new framing into shared roofs or existing foundations, and building fire-rated separations between the main house and the new unit. We read the existing framing before any cuts are made, identify what structural members carry real loads, and coordinate with engineering as needed for new headers, shear panels, or foundation work.
The entire project moves under a single contract. We bring in licensed plumbing, electrical, and HVAC subcontractors for all new or relocated systems, and manage their scheduling against the framing sequence. Roofing transitions, when required, are delivered through our licensed roofing partner. We handle permits and inspection milestones with the city, making sure each trade’s rough and final inspections are called out in the right order so there are no hold-ups closing out the job.
Attached ADU conversions come with logistics unique to working inside or alongside the primary home. We address site access for crews and material deliveries, setting up dust protection and maintaining security so the rest of the house stays livable during the build. Noise and work-hour constraints are planned into the schedule, especially if the main home is occupied.
On the structural and code side, our focus is on clean tie-ins – matching new framing to the original with dimensional or engineered lumber as the span demands, and setting hardware that meets each jurisdiction’s fire separation and energy code. Where garage conversions bring slab cuts or existing foundation quirks, we evaluate what can be reused and what needs new concrete, never concealing problems behind finished floors or walls.

ADU Construction
ADU construction can turn unused yard space or an underbuilt garage into a code-compliant, permitted dwelling. Ridgeline Western Construction manages the entire ADU process from engineering and permits through buildout. We coordinate every step—design, structural framing, rough trades, and finish work—under a single contract and schedule. The result is one point of responsibility and a legal accessory unit ready for use or rental, with full permit documentation.

Guest House & Casita Construction
Guest house and casita construction takes an empty backyard, detached garage, or space above a garage and turns it into a finished, permitted secondary dwelling unit. Ridgeline Western Construction handles design coordination, structural planning, permits, and manages construction from foundation through finish. Owner Steven Moreno is personally on site through all phases, from framing to final walkthrough. You get one contract covering all trades, with framing and carpentry self-performed and every other specialist scheduled and supervised to completion.


Need Attached ADU Work Done?
TEXT/CALL (909) 676-2814

About Our Attached ADU Services
Ridgeline Western Construction is owner-operated by Steven Moreno, a general contractor and framing specialist who is on every project from scope meeting through final walkthrough. Attached ADU work is all about careful transitions between old and new — tying new structure to an existing house, sharing walls, matching rooflines, and preserving or upgrading foundation conditions. Steven inspects the original framing in person, flags undersized or compromised structural members, and confirms that every wall opening, tie-in, and fire separation will hold up under load and pass inspection. His hands-on framing experience means hidden weak points get opened and corrected before finishes go on, and each phase moves only after structure and compliance are verified, not just assumed. With Ridgeline Western Construction, the attached ADU is built as a structural extension, not just an added space.

ABOUT US
Ridgeline Western Construction
.png)
who we are
Ridgeline Western Construction is owner-operated by Steven Moreno, a general contractor and framing specialist who is on every project from scope meeting through final walkthrough. For us, general contracting means staying hands-on: framing and carpentry self-performed, direct field management during every sequence, and all licensed subcontractors signed onto a unified schedule. Each job starts with engineering and permitting mapped out and ends with a permit record the city and owner both accept as final. Every decision gets made face to face on the project, not handed down. That’s how we deliver accountable completion on each project, with all trades managed and every phase closed out properly.
Frequently Asked Questions
Yes. Ridgeline Western Construction is a licensed California Class B general building contractor, fully insured.
Our license number is #1147197Ridgeline Western Construction is based out of San Bernardino serving them and communities throughout southern California including Riverside, Los Angeles, and Orange County.
If you don't see your city listed, reach out and we'll confirm coverage.Framing, home additions, ADU construction, new home construction, whole-home remodeling, structural work, fire damage rebuilds, and commercial construction in Fontana, CA & throughout San Bernadino. The Owner Steven Moreno is an expert in framing and carpentry with anything falling outside of expertise being managed through him allowing you to have your building under one contract.
Yes. Every starts with engineering and permitting mapped out, and closes with inspections and a completed permit record from the building department. You get documentation for every phase.
Framing and carpentry are performed by us. Electrical, plumbing, HVAC, and roofing are handled by licensed subcontractors that we schedule and manage under the same contract that way you have one point of contact for your project.
Call or text Steven at +1 (909) 676-2814. Go over your project, plans or interest in a plan.. Then he'll walk through the scope and put together an estimate for you to continue

What Our Clients Say about us..
"I connected with Steven Moreno at Ridgeline Western Construction about a year ago when I was scoping out a project. Steven’s knowledge blew me away from framing, additions, new construction, materials, etc. He broke everything down like it was nothing & in a way that I actually could understand. The company is based out of Fontana and covers a huge range from San Bernardino and Riverside all the way through Los Angeles and Orange County. So if you’re in that area and need a general contractor that you can rely on then I would highly recommend Ridgeline Western Construction to get the job done right."
- Thomas Shields
.png)
.png)


GET STARTED
Get your attached adu construction estimate today.
View other property types we work on

Service Areas
We provide listings of areas we serve if you don't see your city then contact us to confirm.














